855.444.6872 Contact Us Mon-Sat 10a-6p
DRIVEN BY CARE

Rear Lamp Wiring Assy - 232" Long - Without Leads for Backup Lights

Rear Lamp Wiring Assy - 232" Long - Without Leads for Backup Lights
$433.99 ea
NEWARRIVING SOONEstimated Ship Date 10/14/2026 (If Ordered Today)
Model: 3128716
Select a Vehicle or refer to the Vehicle Fitment Tab below to verify that this part fits your vehicle.
STANDARD
DELIVERY
STORE PICKUP
[More Info]

  • High Quality Rear Lamp Harness
  • Installs Like Original
  • Comes Without Leads For Back Up Lights
  • Strong & Secure Wiring Connectors
  • 232" Overall Length
  • Photo For Reference Only
  • Made In The U.S.A.

This quality reproduction harness is made to fit just like the original and restores your classic's electrical system to like-new condition for trouble-free operation and long-life.

Vehicle Fitment:

The Vehicle Fitment Guide is to be used as a general reference. The data has been provided by our suppliers and manufacturers and may contain errors or incorrect data. Always refer to a professional to verify correct fitment for your vehicle.
Make Model Years
Ford Fairlane 1964

Reviews:

Write a Review
* Your Name:
* Email (This will not be displayed)
* Rating:
Comments:

Ask a question about

Rear Lamp Wiring Assy - 232" Long - Without Leads for Backup Lights: